From the first sketch to the agreed specification: find answers about planning stainless steel furniture, material airlocks and custom fabrications. Choose the topic that fits your project.

What would you like to clarify for your project?

Key questions from planning, engineering and procurement, organised by topic. We discuss the details of specific installation requirements with you directly.

01

Enquiries and planning

The right information turns your idea into a clear basis for planning.

Prepare a project enquiry →

What information helps with an initial project enquiry?

Tell us the intended use, the product you need, its dimensions and the quantity. Include the installation conditions, known loads and requirements for cleaning and equipment. Photographs, a dimensioned sketch or existing plans help us understand the project. If details are still open, highlight them so we can clarify them with you.

Do I already need a complete technical drawing?

For the first discussion, a clear description of the task and the dimensions you know are sufficient. A sketch or photographs of the installation area are also useful. An initial enquiry does not constitute approval for manufacture. As the project develops, we agree which drawings, dimensions and details need to be finalised.

Can I send CAD files and other technical documents?

Yes. Existing documents can support the technical discussion. For drawings, specify the revision, measurement units and any important tolerances. Agree with us which files are needed and how to send them. This helps ensure the documents can be used for the next stages of planning.

What happens after I submit an enquiry?

We first clarify the task and any missing information. We then discuss dimensions, materials, equipment and interfaces with you. This provides the basis for defining the scope of supply, the next planning stages and the required documents.

02

Material airlocks and pass-through units

Our specialty: material transfer adapted to your rooms, the items being transferred and your workflow.

View material airlocks →

Which material airlock suits my transfer process?

The choice depends on the items being transferred, the transfer procedure and the requirements of the connected areas. KLEER offers active and partially active material airlocks, passive airlocks with trolley access and pass-through units. Describe what needs to move between which areas and what ventilation equipment is available. We can then discuss the appropriate configuration.

Which dimensions are needed for a material airlock?

Important details include the installation opening, wall construction and available space on both sides. Also provide the dimensions of the items being transferred, the transport trolley where applicable and the required clear passage dimensions. Mark adjacent equipment, door areas and existing connections on a sketch.

Are flush-floor material airlocks with trolley access possible?

Yes. The range includes passive, flush-floor material airlocks for transferring trolleys or other mobile equipment. Passage dimensions, the floor connection and space in front of the doors are adapted to the installation. Tell us the dimensions and weight of the loaded trolley or equipment and the intended direction of travel.

What needs to be clarified for supply and exhaust air connections?

For partially active material airlocks, the configuration depends on the existing or planned ventilation connections. Options include versions with a supply air connection and connection to an on-site exhaust air system. Specify the intended interfaces and the requirements of your specialist planner. Responsibilities for connection work, controls and testing should also be clear from an early stage.

03

Materials, specifications and equipment

The design follows the requirements of your workstation and processes.

Materials and finishes →

Are custom dimensions and equipment options available?

Yes. Dimensions and equipment are adapted to your requirements for the particular product. Worktables can, for example, incorporate shelves, drawers, mobile pedestals or computer holders. Basin arrangements and supporting structures can be planned for washbasin and sink units. Tell us which functions you need and how much space is available.

How are material, surface finish and cleaning requirements agreed?

The starting point is the application and the conditions the product will be exposed to. Share any material specifications, the cleaning procedure and the cleaning and disinfection agents used. Include any prescribed material grades or requirements for polishing and surface roughness in your enquiry. Material, finish and accessibility for cleaning are agreed for the specific project.

Which load details do you need for tables, shelving or trolleys?

Specify the weight and dimensions of the equipment, containers or materials. It is also useful to know whether the load is distributed evenly or concentrated over small areas. For trolleys, the total loaded weight, transport route and conditions at the point of use are relevant. The required load capacity is agreed for the specific design.

How are standards, cleanroom requirements and documentation addressed?

State the required standards, requirements from the room concept, and any necessary testing or supporting documents when you enquire. We clarify which requirements the configuration needs to meet and which documents are included in the scope of supply. A general product description does not replace this project-specific agreement.

04

Quotations, delivery and documents

Scope of supply, schedules and documentation are defined for your project.

Technical documents →

How is custom fabrication priced when stainless steel prices change?

Dimensions, material grade, material quantity, design and equipment determine the work involved. Quantity, processing and agreed additional services also play a part. Current material procurement costs are included in the project calculation. The prices, scope and validity of the specific quotation therefore apply. The basis is reviewed if the order is placed later or the requirements change.

When can the price and delivery date be agreed?

The specification and scope of supply must first be sufficiently clear. Material availability, required components, manufacturing work and necessary approvals affect the schedule. Tell us your preferred delivery window and fixed project dates as early as possible. The specific date is defined in the quotation or when the order details are agreed.

Are delivery, installation and connection work automatically included?

The agreed scope of supply determines what is included. Specify the services you need and what is already provided on site. These may include transport and positioning, fixing, fittings, service connections or connecting a material airlock. This allows responsibilities and interfaces to be clarified before the order is placed.

Which technical documents should I request early?

Specify the documents your planning, quality assurance or acceptance process requires. These may include dimensioned drawings, material information, operating instructions or project-specific supporting documents. The documents available or to be prepared are agreed for the particular configuration. General product information is available on the product pages and in the Technical documents section.

STILL HAVE A QUESTION?

Let’s discuss the details of your project.

Send us your current plans or describe the task. Together, we can clarify which information and next steps will help move your project forward.